The outlet piece of the big bag is fitted over the inlet piece and stuck in place by manually or pneumatically reducing the clamping disc. Then the tie-up string is undone and the massive bag a little bit lifted because of the chain hoist to stress the outlet of the large bag.Each individual passage is often controlled by a PLC panel, which ensures